Warehouse main hall before transformation

Larger Projects · Case study

Warehouse
Transformation.

A complete strip-out and refit of a large Sydney warehouse — clearing decades of dated joinery, flooring and finishes, then making good throughout to ready the space for its next use.

Project type

Strip-out & fit-out

Sector

Commercial

Location

Artarmon, NSW

Scope

Full interior

The brief

From tired retail space to blank canvas.

The site was a large former showroom and warehouse — fitted out over years with built-in joinery, mixed flooring, feature walls and a mezzanine customer area. To ready it for the next tenant, all of it had to come out, cleanly and safely.

  • Remove dated shelving, joinery and partitions
  • Strip mixed tile, timber and carpet flooring
  • Make good walls, ceilings and structure throughout
  • Leave a clean, safe, lettable shell ready for fit-out
Warehouse building exterior — 22 entrance

Before

What we started with.

Years of accumulated fit-out — built-in units, feature walls, a raised customer area and four different floor finishes across one floorplate.

Warehouse hall cleared during works

The work

Cleared, repaired, made good.

Working methodically across the floorplate, the team removed every built-in element, lifted the mixed flooring, and patched and prepared the walls and structure — keeping the site safe and tidy at every stage.

  • Joinery, partitions and shelving fully removed
  • Flooring lifted back to slab
  • Walls patched, sanded and prepared for paint
  • Waste managed and removed responsibly

Before & after

The transformation.

The "before" frames are the real site as we found it. Drop your finished completion photos into the "after" slots — each one saves to its spot.

Before
Main hall before
Main hall — mixed flooring & raised customer area
Completed
Completed — drop your finished photo here
Before
Feature wall before
Feature wall & ramp — dated finish
Completed
Completed — drop your finished photo here

The outcome

A clean, safe, lettable shell — handed over ready for its next chapter.

One coordinated team handled the whole strip-out, so the owner dealt with a single point of contact from empty fit-out to finished handover.

Start your project Back to Projects
Get a Free Quote